BONSALL, SAN DIEGO COUNTY — November 9, 2026. The county's Golf Club Drive Green Street project proposes a new sidewalk, landscaped filtration areas and trash-capture devices near Old River Road, with completion targeted in 2027.
A different project from the flood-prone Camino del Rey crossing
San Diego County's Watershed Protection Program describes the Golf Club Drive Green Street Project along Golf Club Drive and part of Old River Road in Bonsall. Its public information page lists stormwater-treatment improvements, trash-capture devices, landscaping and a new sidewalk. This should be distinguished from the separate major capital project to elevate the flood-prone Camino del Rey low-flow crossing near Moosa Creek.
Water-quality and pedestrian objectives
According to the county, new landscaped systems would filter stormwater runoff before it reaches Moosa Creek and the San Luis Rey River. The project also aims to create a more comfortable walking route with a sidewalk and green buffers. The county identifies bacteria and urban runoff as water-quality concerns; a planned filtration facility is not evidence that measured pollution has already declined.
Projected construction period
The current county page says work was estimated to start in fall 2026 with completion anticipated during 2027. It cautions that construction timing can change due to permitting, weather or other conditions. Temporary access, utilities, walking routes and vehicle travel may be affected during actual work, with traffic-control signs to be posted.
How to seek a current status update
The page identifies Clint Boschen, county project manager, at Clinton.Boschen@sdcounty.ca.gov and (858) 716-7993. Residents can ask which segments are funded and under contract, which sidewalks are affected, whether construction actually started and where traffic notices will appear. California58 has not inspected the construction site or confirmed the work has commenced.
Primary sources and editorial scope
San Diego County Watershed Protection — Golf Club Drive Green Street Project. These are public records or official listings; future plans and availability should be confirmed with the responsible agency. To provide a correction or a local update, contact Bonsall News.
Support Bonsall News — San Diego County | California58
Choose how to support Bonsall News — San Diego County | California58:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Bonsall News — San Diego County | California58” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Bonsall News — San Diego County | California58
- Bonsall's Moosa Creek restoration plan needs $30.5 million more, county budget shows →
- Bonsall Golf Club Drive stormwater work planned through 2027 →
- Bonsall's Camino del Rey flood project budgeted at $12.3M →
- Bonsall equestrian staging-area public meeting now planned for winter 2027 →
- Bonsall families invited to November 17 coffee conversation with district superintendent →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.